Pregunta
Determine the slope required in
(accurate to three decimal
places) for a 750 mm diameter PVC wastewater sewer, to achieve a
full flow velocity of
. Manning’s roughness coefficient for
PVC is 0.010 .
places) for a 750 mm diameter PVC wastewater sewer, to achieve a
full flow velocity of
PVC is 0.010 .
Ask by Turner Fuentes. in Canada
Dec 09,2024
Solución de inteligencia artificial de Upstudy
Respuesta verificada por el tutor
Responder
The required slope for the sewer is approximately 0.005 m/m.
Solución

¡Inicia sesión para desbloquear respuestas gratis!
Una plataforma de aprendizaje en la que confían millones de estudiantes y profesores reales.

Respondido por UpStudy AI y revisado por un tutor profesional
Como
Extra Insights
To determine the slope required for the specified flow conditions, we can use Manning’s equation, which is given by:
Where:
-
= flow velocity (1.92 m/s) -
= Manning’s roughness coefficient (0.010 for PVC) -
= hydraulic radius (for a circular pipe, when full-flow, where is the diameter) -
= slope of the energy grade line (which is what we want to find)
The diameter
is 750 mm, which is 0.75 m.
Calculating
:
Putting values into the equation:
Now, calculating
:
Now substitute back into the equation:
Now solve for
:
Now, square both sides to find
:
Thus, the slope required for a 750 mm diameter PVC wastewater sewer to achieve a full-flow velocity of 1.92 m/s is approximately:

¡Prueba Premium ahora!
¡Prueba Premium y hazle a Thoth AI preguntas de matemáticas ilimitadas ahora!
Quizas mas tarde
Hazte Premium