The cost of operating the Maintenance Department is to be allocated to four production departments based on the floor space each occupies. Department A occupies \( 900 \mathrm{~m}^{2} \); Department B, \( 800 \mathrm{~m}^{2} \); Department \( \mathrm{C}, 1200 \mathrm{~m}^{2} \); and Department \( \mathrm{D}, 500 \mathrm{~m}^{2} \). If the July cost was \( \$ 57,800 \), how much of the cost of operating the Maintenance Department should be allocated to each production department? The operating cost for Department A is \( \$ 15,300 \). (Simplify your answer.) The operating cost for Department B is \( \$ \) (Simplify your answer.)
Real Tutor Solution
Answer
Solution
Sign in to Unlock Answers for Free!
A Learning Platform Trusted by Millions of Real Students and Teachers.
Reviewed and approved by the UpStudy tutoring team
Bonus Knowledge
To allocate the cost of operating the Maintenance Department, we first need to determine the total floor space occupied by all departments. Total floor space = \( 900 + 800 + 1200 + 500 = 3400 \, \mathrm{m}^2 \). Next, we can find the cost per square meter by dividing the total cost by the total floor space: Cost per square meter = \( \frac{\$ 57,800}{3400 \, \mathrm{m}^2} \approx \$ 17 \, \text{per} \, \mathrm{m}^2 \). Now we can allocate the costs based on each department's floor space: - For Department A: \( 900 \, \mathrm{m}^2 \times \$ 17 \, \approx \$ 15,300 \). - For Department B: \( 800 \, \mathrm{m}^2 \times \$ 17 \, \approx \$ 13,600 \). - For Department C: \( 1200 \, \mathrm{m}^2 \times \$ 17 \, \approx \$ 20,400 \). - For Department D: \( 500 \, \mathrm{m}^2 \times \$ 17 \, \approx \$ 8,500 \). So, the operating cost for Department B is \( \$ 13,600 \).